PRINCIPAL ACCOUNTABILITIES (KEY PERFORMANCE AREAS) 1. G.I. Systems, Copper Systems, PEX System and Carbon Steel piping. 2. Installations of all
PRINCIPAL ACCOUNTABILITIES (KEY PERFORMANCE AREAS) 1. G.I. Systems, Copper Systems, PEX System and Carbon Steel piping. 2. Installations
PRINCIPAL ACCOUNTABILITIES (KEY PERFORMANCE AREAS) 1. G.I. Systems, Copper Systems, PEX System and Carbon Steel piping. 2. Installations of all domestic
PRINCIPAL ACCOUNTABILITIES (KEY PERFORMANCE AREAS) 1. G.I. Systems, Copper Systems, PEX System and Carbon Steel piping. 2. Installations of all domestic
PRINCIPAL ACCOUNTABILITIES (KEY PERFORMANCE AREAS) 1. G.I. Systems, Copper Systems, PEX System and Carbon Steel piping. 2. Installations of all domestic
JOB SUMMARYNADUTIES AND RESPONSIBILITIESi.To participate in minor operation and maintenances of all mechanical equipment; ii.To participate in installation of
Multiple Positions at JVACEE June, 2022 J-V-A-C-E-E, Julius Nyerere Hydro Power Project (JNHPP) is Urgently Looking for the Following Candidates to fill the
Position: Mechanical Fitter About the job North Mara Gold Mine Limited is seeking to recruit a Mechanical Fitters to join Gold Plant, Water Treatment
North Mara Gold Mine Limited is seeking to recruit Mechanical Fitters to join Gold Plant, Water Treatment Plant and Brine Plant team. The
779 Jobs at a Joint venture company of Arab Contractors And El-sewedy Electric JVACEE JVACEE is a joint venture company of Arab contractor and El-sewedy